Aileron work

10/14/2011

The first aileron is now sheeted and mounted. I cut the access slots to get to the hinges and have it installed with the correct hardware. I messed around a bit with the bellcrank location and it is working out, even though the hardware on the arms gets close to the drag wire. I still have to install the 3/8" tubing in the leading edge slot and shape the LE stringer. The end ribs need to be installed and the cap strips need to be glued to each rib. Getting close to wrapping up #1. The rest should go more quickly, now that I have it figured out better.


Older Entry Blog Home Newer Entry

Leave Comment

Name
Comment