Tunnel progress

1/21/2012

Continued work on the exhaust tunnel. Tonight I got the center panel of aluminum cut and pilot drilled. A break was bent in the rear edge to match the flanges and rear former. A flange was bent on the front for stiffness. This is where the stainless will overlap after wrapping down from the firewall. The inside flanges on the fiberglass parts also got trimmed to size and cleaned up a bit. Got it all clecoed togther and took a couple pictures.

More here. Scroll to the bottom for the latest.


Older Entry Blog Home Newer Entry

Leave Comment

Name
Comment